CCTF/2012-59
Report of the CCL-CCTF Frequency Standards Working Group
F. Riehle (PTB), P. Gill (NPL)
07/10/2012
CCTF/2012-58
Summary elements for consideration - Coordinated Universal Time (UTC)
B. Nelson
07/10/2012
CCTF/2012-57
Possible redefinition of UTC
F. Arias (BIPM)
07/10/2012
CCTF/2012-56
The future of the UTC time scale
R. Beard (ITU-R)
07/10/2012
CCTF/2012-55
Time Department programme of work and budget 2013-2015 and plans for 2016-2019
F. Arias (BIPM)
06/10/2012
CCTF/2012-54
Report of the IERS Conventions Centre
G. Petit (BIPM), B. Luzum (USNO)
06/10/2012
CCTF/2012-53
The uncertainty in frequency and the prediction uncertainty
G. Panfilo (BIPM)
06/10/2012
CCTF/2012-52
Report of the CCTF WG on the MRA (presentation)
F. Cordara (INRIM)
06/10/2012
CCTF/2012-51
GPS and GLONASS P3 combination
A. Harmegnies (BIPM), P. Defraigne (ORB)
06/10/2012
CCTF/2012-50
GNSS processing techniques: review of some topics for the coming years
G. Petit (BIPM)
06/10/2012
CCTF/2012-49
UTCr - A rapid realization of UTC
BIPM Time Department
06/10/2012
CCTF/2012-48
Frequency standards in TAI and realization of TT(BIPM)
G. Petit, G. Panfilo (BIPM)
06/10/2012
CCTF/2012-47
Improvements in ALGOS
G. Panfilo (BIPM)
06/10/2012
CCTF/2012-46
Multi-technique combination for UTC/TAI time and frequency transfer
Z. Jiang, G. Petit, W. Lewandowski (BIPM)
06/10/2012
CCTF/2012-45
Report on activities - BIPM Time Department
F. Arias (BIPM)
06/10/2012
CCTF/2012-44
IGS Clock products Working Group
K. Senior (IGS)
06/10/2012
CCTF/2012-43
Report of the CCTF WG ATFT
P. Tuckey (LNE-SYRTE)
13/09/2012
CCTF/2012-42
Report of the CCTF WG on PFS
T. Parker (NIST)
13/09/2012
CCTF/2012-41
Report of the CCTF WG on TAI
P. Tavella (INRIM)
12/09/2012
CCTF/2012-40
Proposal of reccomendation on the upgrade and calibration of GNSS equipment in the timing laboratories
CGGTTS
12/09/2012
CCTF/2012-39
ROA report on activities
ROA
11/09/2012
CCTF/2012-38
APMP report on activities
Huang-Tien Lin and Chia-Shu Liao (TL)
11/09/2012
CCTF/2012-37
NIM report on activities
NIM
11/09/2012
CCTF/2012-36
VSL report on activities
VSL
10/09/2012
CCTF/2012-35
Proposal of recommendation - Development of continental-scale fibre optical time and frequency networks...
CCFT WG on ATFT
10/09/2012
CCTF/2012-34
NRC report on activities
NRC
07/09/2012
CCTF/2012-33
NIST report on activities
NIST
07/09/2012
CCTF/2012-32
NPLI report on activities
NPLI
07/09/2012
CCTF/2012-31
INRIM report on activities
INRIM
07/09/2012
CCTF/2012-30
NMISA report on activities
NMISA
07/09/2012
CCTF/2012-29
METAS report on activities
METAS
06/09/2012
CCTF/2012-28
NPL report on activities
NPL
06/09/2012
CCTF/2012-27
Report on SP-MIKES fibre link
K. Jaldehag (SP)
06/09/2012
CCTF/2012-26
SP report on activities
SP
06/09/2012
CCTF/2012-25
Terms of reference of the CCTF WG on TWSTFT (proposed)
D. Piester (PTB)
06/09/2012
CCTF/2012-24
UTCr: a rapid realization of UTC
BIPM
06/09/2012
CCTF/2012-23
KRISS report on activities
KRISS
04/09/2012
CCTF/2012-22
TL report on activities
TL
04/09/2012
CCTF/2012-21
Programme of work of the BIPM Time Department for 2013-2015
F. Arias
04/09/2012
CCTF/2012-20
ORB report on activities
ORB
04/09/2012
CCTF/2012-19
Report of the CCFT WG on TWSTFT
D. Piester (PTB)
04/09/2012
CCTF/2012-18
LNE-SYRTE report on activities
LNE-SYRTE
03/09/2012
CCTF/2012-17
CENAM report on activities
CENAM
02/09/2012
CCTF/2012-16
SIM report on activities
M. Lopez (CENAM)
02/09/2012
CCTF/2012-15
PTB report on activities
PTB
29/08/2012
CCTF/2012-14
Resolution 1 of the 24th CGPM: On the possible future revision of the International System of Units, the SI
24th CGPM
29/08/2012
CCTF/2012-13
NMIJ report on activities
NMIJ
28/08/2012
CCTF/2012-12
Report of the CGGTTS
J. Levine (NIST)
28/08/2012
CCTF/2012-11
Report of the CCTF WG on the MRA
F. Cordara
28/08/2012
CCTF/2012-10
Letter from the ITU General Secretary to the Director of the BIPM on the future of UTC
ITU
20/08/2012
CCTF/2012-09
Proposal for a new structure of CCTF WGs and chairs
CCTF WG on Strategic Planning
20/08/2012
CCTF/2012-08
Proposal of recommendation, corrected version 12/09/2012
D. Matsakis (USNO)
20/08/2012
CCTF/2012-07
NICT report on activities
NICT
20/08/2012
CCTF/2012-06
USNO report on activities
USNO
20/08/2012
CCTF/2012-05
The prediction uncertainty
G. Panfilo (BIPM), F. Cordara (CCTF WG MRA)
20/08/2012
CCTF/2012-04
Uncertainty in Frequency
G. Panfilo (BIPM), F. Cordara (CCTF WG MRA)
20/08/2012
CCTF/2012-03
Revised versions of Guidelines 2 and 3
CCTF WG MRA
20/08/2012
CCTF/2012-02
VNIIFTRI report on activities
VNIIFTRI
19/08/2012
CCTF/2012-01
Agenda of the 19th meeting of the CCTF
L. Erard (CIPM), F. Arias (CCTF)
19/08/2012
CCTF/2012-00
Schedule of meetings
F. Arias (BIPM)
19/08/2012