CCM.F-K3.a, CCM.F-K3.b, APMP.M.F-K3.a and APMP.M.F-K3.b

 

MEASURAND   Force

NOMINAL VALUE 500 kN

 

Degrees of equivalence relative to the CCM.F-K3 reference value and its expanded uncertainty Ui at a 95 % level of confidence, both expressed in 10-6.

Force at 500 kN
Di / 10-6
Participating institutes

Enlarged graph

Graph_500kN

CCM.F-K3.a and APMP.M.F-K3.a

 

MEASURAND   Force

NOMINAL VALUE 1 MN

 

Degrees of equivalence relative to the CCM.F-K3 reference value and its expanded uncertainty Ui at a 95 % level of confidence, both expressed in 10-6.

Force at 1 MN
Di / 10-6
Participating institutes

Enlarged graph

Graph_1MN

CCM.F-K3.a, CCM.F-K3.b, APMP.M.F-K3.a and APMP.M.F-K3.b

 

MEASURAND   Force

NOMINAL VALUE 500 kN

 

Degrees of equivalence relative to the CCM.F-K3 reference value and its expanded uncertainty Ui at a 95 % level of confidence, both expressed in 10-6.

LABi Di Uneg,i Upos,i
10-6
10-6
10-6
NPL -12.0 11.3
NIST -1.9 18.9
INRIM 10.4 20.4
VNIIM 8.8 20.7
NIM 7.8 14.0
PTB 1.5 20.2
LNE -5.8 20.7
CEM 5.1 20.6
GUM 36.6 120.1
NMIA -15.6 20.7
NMIJ -4.4 12.5
KRISS 61.3 21.0
NMIA 190 217
NMC, A*STAR -63.6 209
NPLI 24.5 110
SCL -124 270
CMS 445 504
SNSU-BSN 10.9 203
VMI-STAMEQ 125 113
Participating institutes
CCM.F-K3.a and b
APMP.M.F-K3.a and b

CCM.F-K3.a and APMP.M.F-K3.a

 

MEASURAND   Force

NOMINAL VALUE 1 MN

 

Degrees of equivalence relative to the CCM.F-K3 reference value and its expanded uncertainty Ui at a 95 % level of confidence, both expressed in 10-6.

LABi Di Uneg,i Upos,i
10-6
10-6
10-6
NPL -9.5 12.7
NIST -9.2 19.4
INRiM 8.9 22.5
VNIIM 3.9 22.4
NIM 10.3 16.1
PTB 4.2 22.2
NMIA 249 216
NMC, A*STAR -80.6 207
NPLI 38.1 109
SCL -1129 503
CMS 343 506
SNSU-BSN -17.8 203
VMI-STAMEQ 50.9 118
Participating institutes
CCM.F-K3.a
APMP.M.F-K3.a
SIM.M.F-K3.a
Metrology area, Sub-field Mass and related quantities, Force
Description High force measurements
Time of measurements 2023 - 2024
Status Measurements in progress
References

SIM.M.F-K3.a Technical Protocol

SIM.M.F-K3.a Technical Protoccol

Measurand Force
0 MN, 0.5 MN and 1 MN
Transfer device Force measurement device
Comparison type Key Comparison
Consultative Committee CCM (Consultative Committee for Mass and Related Quantities)
Conducted by SIM (Inter-American Metrology System)
Comments The technical comparison protocol has been updated to version 4.
Pilot institute INM (CO)
Instituto Nacional de Metrología de Colombia
Colombia
Contact person Juan Alberto Arias Prieto

+571-2 54 22 22
Additional
First Name Last Name
wwww@ww.www +356719836 Institute 1 Institute 1 Khmelnitskiy
Pilot laboratory
INM (CO)

Instituto Nacional de Metrología de Colombia, Colombia, SIM

CENAM

Centro Nacional de Metrologia, Mexico, SIM

IDIC

Instituto de Investigaciones y Control, Chile, SIM

INEN

Servicio Ecuatoriano de Normalización, Ecuador, SIM

INMETRO

Instituto Nacional de Metrologia, Qualidade e Tecnologia, Brazil, SIM

INTI

Instituto Nacional de Tecnologia Industrial, Argentina, SIM

LACOMET

Laboratorio Costarricense de Metrologia, Costa Rica, SIM

NIST

National Institute of Standards and Technology, United States, SIM

CCM.F-K3.a, CCM.F-K3.b, APMP.M.F-K3.a and APMP.M.F-K3.b

 

MEASURAND   Force

NOMINAL VALUE 500 kN

 

The key comparison reference value, xR, is calculated as the weighted mean of the corrected measurement results from CCM.F-K3.a and CCM.F-K3.b. Correlations were considered when evaluating the associated standard uncertainty, uR.

 

        xR = 0.5 × 10-6     uR = 1.8 × 10-6

 

The degree of equivalence of each laboratory i with respect to the key comparison reference reference value is given by a pair of terms, both expressed in 10-6:

Di , the relative deviation of the final result from xR, and Ui, its expanded uncertainty (k = 2).

 

Linking APMP.M.F-K3.a and APMP.M.F-K3.b to CCM.F-K3.a and CCM.F-K3.b

The institutesNIM, PTB and NMIJ provide the link between the key comparison CCM.F-K3.a and CCM.F-K3.b and APMP.M.F-K3.a and APMP.M.F-K3.b, having participated in both comparisons. The linking process is described in Section 8 of the APMP.M.F-K3.a and b Final report.

CCM.F-K3.a and APMP.M.F-K3.a

 

MEASURAND   Force

NOMINAL VALUE 1 MN

 

The key comparison reference value, xR, is calculated as the weighted mean of the corrected measurement results from CCM.F-K3.a. Correlations were considered when evaluating the associated standard uncertainty, uR.

 

        xR = 1.0 × 10-6     uR = 4.4 × 10-6

 

The degree of equivalence of each laboratory i with respect to the key comparison reference reference value is given by a pair of terms, both expressed in 10-6:

Di , the relative deviation of the final result from xR, and Ui, its expanded uncertainty (k = 2).

 

Linking APMP.M.F-K3.a and APMP.M.F-K3.b to CCM.F-K3.a and CCM.F-K3.b

The institutesNIM, PTB and NMIJ provide the link between the key comparison CCM.F-K3.a and CCM.F-K3.b and APMP.M.F-K3.a and APMP.M.F-K3.b, having participated in both comparisons. The linking process is described in Section 8 of the APMP.M.F-K3.a and b Final report.

CCM.F-K3.a, CCM.F-K3.b, APMP.M.F-K3.a and APMP.M.F-K3.b

 

MEASURAND   Force

NOMINAL VALUE 500 kN

 

 

CCM.F-K3.a and CCM.F-K3.b

CCM.F-K3.a: Two force steps of 500 kN were employed.

CCM.F-K3.b: Two compression force transducers of 500 kN and one force step of 500 kN were employed.

Measurements were carried out from 2005 to 2011.

The measurement results for CCM.F-K3.a and CCM.F-K3.b are presented in Section 7 (pp. 6 to 17) of the CCM.F-K3 Final report.

 

APMP.M.F-K3.a and APMP.M.F-K3.b

The measurement results for APMP.M.F-K3.a and APMP.M.F-K3.b are presented in Section 6 of the APMP.M.F-K3 a and b Final report.

CCM.F-K3.a and APMP.M.F-K3.a

 

MEASURAND   Force

NOMINAL VALUE 1 MN

 

 

CCM.F-K3.a

CCM.F-K3.a: Two compression force transducers of 1 MN were employed.

 

Measurements were carried out from 2005 to 2011.

The measurement results for CCM.F-K3.a are presented in Section 7 (pp. 6 to 17) of the CCM.F-K3 Final report.

 

APMP.M.F-K3.a 

The measurement results for APMP.M.F-K3.a are presented in Section 6 of the APMP.M.F-K3 a and b Final report.