From owner-igsmail@igscb.jpl.nasa.gov Thu Aug  2 15:07:32 EDT 2001
Received: from nasa-fw.usno.navy.mil (igscb.jpl.nasa.gov [137.79.24.21])
	by maia.usno.navy.mil (8.9.3 (PHNE_22672)/8.9.3) with SMTP id PAA19004;
	Thu, 2 Aug 2001 15:07:31 -0400 (EDT)
Received: from igscb.jpl.nasa.gov ([137.79.24.21]) by nasa-fw.usno.navy.mil
          via smtpd (for maia.usno.navy.mil [10.1.3.122]) with SMTP; 2 Aug 2001 19:07:31 UT
Received: (from majordomo@localhost)
	by igscb.jpl.nasa.gov (8.9.3/8.9.3) id LAA12367
	for igsmail-outgoing; Thu, 2 Aug 2001 11:51:53 -0700
X-Authentication-Warning: igscb.jpl.nasa.gov: majordomo set sender to owner-igsmail using -f
Message-Id: <3.0.32.20010802185408.01449c44@127.0.0.1>
Date: Thu, 02 Aug 2001 18:54:09 +0000
To: IGS Mail Recipients 
From: Herb Dragert 
Subject: [IGSMAIL-3453]: ALBH clock change
Cc: schmidt@pgc.nrcan.gc.ca, gpsop@pgc.nrcan.gc.ca
Sender: owner-igsmail@igscb.jpl.nasa.gov
Precedence: bulk
Status: RO

******************************************************************************
IGS Electronic Mail      02 Aug 11:51:53 PDT 2001      Message Number 3453
******************************************************************************

Author: Herb Dragert

**************************************************************************
                     GEOLOGICAL SURVEY OF CANADA
                   WESTERN CANADA DEFORMATION ARRAY
                         GPS TRACKER ADVISORY

GPS TRACKER ID: ALBH
DOMES No.:      40129M003
MONUMENT No.    927000
LOCATION:       Albert Head Base, Victoria, B.C., Canada
                
ADVISORY:

Continuous, stable AC power has been restored at the site and the AOA
BenchMark receiver was switched from internal clock steering back onto the
external passive MASER clock at 17:24UT today, Aug. 2, 2001 (Day 214). This
switch resulted in a brief data gap from 17:17 to 17:24 UT. No further data
interruptions are expected.


Herb Dragert
Pacific Geoscience Centre
dragert@pgc.nrcan.gc.ca