From igscb@igscb.jpl.nasa.gov Thu Jul 8 08:09:36 EDT 1999 Received: from igscb.jpl.nasa.gov (igscb.jpl.nasa.gov [128.149.70.171]) by maia.usno.navy.mil (8.8.6 (PHNE_17135)/8.8.6) with ESMTP id IAA12200; Thu, 8 Jul 1999 08:09:35 -0400 (EDT) Message-Id: <199907081209.IAA12200@maia.usno.navy.mil> Received: by igscb.jpl.nasa.gov (1.39.111.2/16.2) id AA237551696; Thu, 8 Jul 1999 04:01:36 -0700 Date: Thu, 8 Jul 1999 04:01:36 -0700 To: IGS Mail RecipientsFrom: IGS Mail Service Reply-To: IGS Mail Administrator Errors-To: IGS Mail Administrator Sender: IGS Mail Administrator Subject: No 2359: IGS Workshop Summary Status: RO ****************************************************************************** IGS Electronic Mail Thu Jul 8 4:01:35 PDT 1999 Message Number 2359 ****************************************************************************** Author: Tim Springer and Yehuda Bock Subject: IGS Workshop Summary Dear IGS colleagues, Below is a summary of the IGS analysis center workshop, which took place from 8-10 June 1999 at the Scripps Institution of Oceanography in La Jolla, California. The appendix contains an e-mail with the AC and AAC action items which resulted from the workshop. This e-mail was distributed to the ACs and AACs on 16 June 1999 and is included for completeness. We would like to remind all authors to provide a written contribution by 31 August 1999. Full length papers are preferred but an extended abstract summarizing your presentation is also acceptable. All submissions for publication in the workshop proceedings should be sent to the IGS Website at: --> http://igscb.jpl.nasa.gov/submissions/guide.html The workshop at Scripps was most enjoyable and stimulating and on behalf of the IGS I would like to thank my co-convenor, Yehuda for his great effort and Myra Medina for the local organization which was quite excellent! Summary of the 1999 IGS AC workshop ----------------------------------- The 1999 IGS analysis center workshop dealt with 2 major topics. - Real- and near-real time products and applications - Long-term stability and accuracy of GPS Reference Frame The workshop was opened with a welcome address by John Orcutt, Director of IGPP, and an introduction by Yehuda Bock. After the opening the status and challenges facing the IGS were addressed by Chris Reigber, Ruth Neilan, Carey Noll, Tim Springer, Angie Moore and Yehuda Bock. Topic 1: Real- and near-real time products and applications ----------------------------------------------------------- The position paper "Moving IGS products towards real-time" written by Gerd Gendt, Peng Fang, and Jim Zumberge, proposed the generation of both more rapid and frequent IGS products for (near-) real-time usage. The generation of these "ultra rapid" products should start on 3 October 1999 (GPS week 1030). The products, which will be delivered every 12 hours (2x per day), will contain a 48 hour orbit arc from which 24 hours are real orbit estimates and 24 hours are orbit predictions. The latency of this product will be only 3 hours. This position paper, which was available before the workshop, may be obtained from the IGSCB at the working location of: --> http://techinfo.jpl.nasa.gov/igs/files/ Note that once the proceedings of the workshop are complete, it will be moved to IGS Publications page at: --> http://igscb.jpl.nasa.gov/overview/pubs.html. One of the "forces" moving the IGS towards real-time products is GPS meteorology. Applications of IGS products for ground and space based meteorology were presented by Seth Gutman, Mike Bevis, and Chris Rocken. Another "force" moving the IGS towards real-time are the low Earth orbiter (LEOs) missions where again meteorology is of primary interest. Mike Watkins presented the status and recommendations of the IGS LEO working group. This working group, with support from other IGS components, will soon issue a call for participation for a "LEO pilot project" where the focus will be mainly on the data gathering issues (1 sec tracking data in hourly batches in near-real-time). Precise orbit determination (POD) of the LEO satellite (either OERSTED or SUNSAT, two satellite missions currently underway with GPS receivers) will also be of interest. This pilot project is planned for October 1999. Jim Zumberge and Angie Moore discussed two issues closely related to the LEO missions, i.e., the LEO ground network and suggestions for a new GPS binary data format. Topic 2: Long-term stability and accuracy of GPS Reference Frame ---------------------------------------------------------------- The position paper "Achieving mm site positions and mm/yr site velocities for geodynamics" written by Tom Herring, Geoff Blewitt, and Remi Ferland was unfortunately not available before the workshop. However, the interesting presentation by Tom Herring, and also the presentation given by Mike Heflin, showed that there are significant geographically correlated variations in the GPS derived time series. Tom's prime conclusion was that if mm/yr velocities are expected we should "call him in 10 years". However, a presentation given by Hadley Johnson on site stability issues indicated that we might have to wait 20 years. The geographically correlated effects may represent actual deformations although Tom Herring concluded that it is likely that they are caused by remaining deficiencies in IGS orbit modeling. These clearly are a cause of concern and require further attention. It also became clear (once again) that the feedback from the ACs to the station operators is still far from optimal. With respect to site stability calibration it would be helpful to have two receivers at a site. which was also recommended at the Network Workshop in Annapolis. Zuheir Altamimi and Remi Ferland showed and discussed the quality of the ITRF-97. Clearly the ITRF-97 is again a major improvement w.r.t. its predecessor (ITRF-96). Remi Ferland showed results which indicate that the VLBI and GPS based polar motion estimates will be in much better agreement in the ITRF-97 than they are in the ITRF-96, where a 0.3 mas bias is observed. It was decided that the IGS will adopt the ITRF-97 reference frame starting with GPS week 1021, 1 August 1999. Presentations by Jim Ray, Markus Rothacher, and Arthur Niell dealt with the problems of mixing different receivers and antennas in the global network. The antenna phase center offsets and variations, of both the receiver and transmit (satellite) antennas, represent one of the major remaining error sources in GPS data analysis. Jim Ray showed that the used of the different code observables (CA vs P1) causes problems for the IGS clock estimates and combination; for more details about this problem see IGSMAIL #2320. Important in view of the long-term stability was the presentation by John Rush from NASA on the microwave spectrum issues and new GPS frequencies. Three important action items were suggested: IGS Contact the International Telecommunication Union, and, each IGS member contact their local radio administration to encourage: (1) The preservation of the radionavigation satellite service band 1559-1567 MHz for use by radionavigation satellite services, with no sharing of any portion of the band with MSS users. (WRC-00 Agenda Item 1.9) (2) Addition of the radionavigation satellite service allocation to cover the band 1164-1188 MHz. (WRC-00 Agenda Item 1.15.1) (3) The addition of an allocation for use in the space-to-space direction for radionavigation satellite services in the 1215-1260 MHz and 1559-1610 MHz bands. (WRC-00 Agenda Item 1.15.2) The workshop concluded with an interesting tour along the posters of all the IGS analysis centers followed by presentations summarizing the status and activities of all the IGS working groups. Workshop recommendations ------------------------ Besides the action items for the ACs and AACs (see appendix) and the three action items proposed by John Rush the following recommendations resulted from the workshop. R1: The operational, regional and global data centers are asked to optimize the data transfer of the hourly RINEX-files in support of the ultra- rapid products R2: The IGS LEO WG will issue a call for participation for a LEO pilot project which will start in October 1999. R3: The IGSCB, in cooperation with the Infrastructure Committee, should enhance the newly developed receiver and antenna name list by adding the tracking techniques of each receiver. This is important in view of the available observables and their effect on the IGS clock estimates. R4: The IGS ACs will have to decide and advertise whether the IGS clock estimates will be based on CA- or P1-code observations. The IGS will have to provide a table containing the CA-P1 code biases. R5: Tom Herring will draft a letter for the IGS Governing Board to request VLBI tracking of the GPS satellites in order to determine the L1 and L2 phase center offsets of the GPS satellite antennas. R6: Improve the feedback from the AC to the station operators in case of bad station performance. Better advertise the availability of feedback to the station operators. This is the responsibility of the Network Coordinator. Kind Regards, Tim Springer Yehuda Bock Appendix: E-mail send to ACs and AACs on 16 June 1999. ------------------------------------------------------ AC and AAC action items: Date: As soon as possible ------------------------- 1) ACs start submitting ERP files with their predicted orbits. These ERP files should include at least the PM offsets and their rates for the day of the predicted orbits. The inclusion of more values is allowed if this is convenient for the AC. Of course the ERP files should be consistent with the predicted orbits. The standard IGS ERP format should be used. 2) ACs start submitting clock files with their final orbits and the clock files should contain the stations coordinates in the header (see new format description below). 3) The IGS Analysis Center Coordinator (ACC) will contact the IERS, Duncan Agnew, and Hans-Georg Scherneck (et. al.) about setting up some kind of ocean loading service to provide the ACs, AACs, and other IGS customers with ocean loading corrections for the different IGS sites. 4) The ACs are encouraged to (better) advertise the availability of accuracy codes in the orbit (SP3) files. The ACs developing and distributing their own GPS processing software are encouraged to add the capability to automatically use the orbit accuracy codes to their software. Date: July 4, 1999. GPS week 1017 --------------------------------- 1) All ACs, AACs, RINEX files, site-logs, and IGS.SNX should contain the new receiver and antenna names! All IGS products from this week on should use the new receiver and antenna names. The "old but still valid" names become "invalid" for all IGS products after this date. 2) The 4-character id used for both the site-log and the RINEX file name becomes the official 4-character id for the respective site-receiver-antenna combination. This 4-character id should be used to label ALL results from this site-receiver-antenna combination, e.g., SINEX, clock files, etc. etc. New 4-character id's will be the responsibility of the IGSCB (of course stations may propose a 4-char id). The IGSCB will notify the IGS about changes in the 4-char id's by sending an IGSMAIL. Date: August 1, 1999. GPS week 1021 ----------------------------------- 1) All ACs, and AACs start using the ITRF'97 as terrestrial reference frame for their IGS products. Zuheir Altamimi will make available a special IGS SINEX file containing the ITRF'97 positions and velocities of the 51 reference stations (ITRF97_IGS_RS51.SNX and ITRF97_IGS_RS51.SSC). Remi Ferland will work together with Zuheir to ensure the correct list and naming (4-char) of the 51 sites. All ACs and AACs are encouraged to test the new reference frame and to study the changes between the ITRF'96 and ITRF'97 results. Please report your results to the Analysis Center Coordinator. The ACC will (try to) summarize the observed differences in the IGS products and document and distribute them using the IGSMAIL. Date: October 03, 1999. GPS week 1030 ------------------------------------- 1) The ACs are encouraged to start submitting "ultra-rapid" products two times per day according to the scheme as outlined in the position paper of the IGS workshop: title: Moving IGS products towards real-time authors: Gerd Gendt, Peng Fang, Jim Zumberge To avoid naming conflict I would like to propose to use the following naming convention for the products. Use the first two characters of your AC and add a "u" as third character, e.g., cou, emu, esu, gfu... The combined products will be labeled "igu" as proposed in the position paper. This completes my list of must urgent AC action items. Early next week I hope to distribute (after consulting with the organizers at SIO and the IGSCB) the complete list of recommendations and action items of the IGS workshop. Two important items on that list from an AC point of view are the upcoming call for participation in the LEO pilot project, and P1-CA code biases and its effect on the IGS clock estimates. I hope to have informed/remembered you sufficiently. Kind regards, Tim Springer cc: IGS ACs IGS GNAACs IGSCB EUREFCB SIRGAS RNAAC Clock format change to allow for station coordinates in header. Author: Jim Ray --------------------------------------------------------------- Based on discussions at the IGS Analysis Center Workshop, held last week at Scripps Institution of Oceanography, Analysis Centers were asked to include station coordinates in their clock solution files. These coordinates should correspond to the values used in the clock analysis (whether fixed or adjusted). This will be a great convenience for users of these files. This change can be accommodated in the existing "SOLN STA NAME / NUM" header record by using 35 previously blank spaces (for stations on or near the Earth's surface). Note that the geocentric coordinates should be given in millimeter units. The relevant portion of the changed format is: +--------------------+------------------------------------------+------------+ |SOLN STA NAME / NUM | For each station/receiver included in | | | | the clock data records, as well as the | | | | analysis reference clock even if it has | | | | zero values and is not included in the | | | | data records (number given in the | | | | previous header record), include one | | | | record with the following information: | | | | - 4-character station/receiver name | A4,1X, | | | designator | | | | - Unique station/receiver identifier, | A20, | | | preferably the DOMES number for | | | | fixed stations | | | | - Geocentric XYZ station coordinates | I11,X, | | | corresponding to the analysis clock | I11,X, | | | values reported (in millimeters!) | I11 | | | | | | | * REQUIRED for data types "Ax" | | | | | | +--------------------+------------------------------------------+------------+ An example of such a record would look like: GOLD 40405S031 -1234567890 -1234567890 -1234567890SOLN STA NAME / NUM ----|---1|0---|---2|0---|---3|0---|---4|0---|---5|0---|---6|0---|---7|0---|---8| Earlier this month, clarifications were added to deal with reporting analysis clock reference values when the time scale has been re-aligned. All these changes are backwards compatible. The complete documentation is available at http://maia.usno.navy.mil/gpst/clock-format . --Jim -- ----------------------------------------------------------------------------- Tim Springer Astronomical Institute, University of Berne springer@aiub.unibe.ch Sidlerstrasse 5, CH-3012 Bern, Switzerland http://www.cx.unibe.ch/aiub/ Tel: +41 31 6318592 Fax: +41 31 6313869 http://ftp.unibe.ch/aiub ----------------------------------------------------------------------------- [Mailed From: Tim Springer ]