New search facility:  
BIPM Home | Site map | Metrologia | KCDB | JCTLM-DB | Contact us  
   
Joint projects
Summary
International Atomic Time
Clock comparisons
Joint projects
Future work
BIPM calibrations of time transfer equipment
BIPM services in the field of time, frequency and gravimetry
Technical partnerships of the Time, Frequency and Gravimetry Section
Recent publications
Secondments to the BIPM
BIPM annual report on time activities 2009
What time is it?
FTP server of the Time, Frequency and Gravimetry Department
Special issue on
Timescale Algorithms

Related links

Conventions Product Centre (CPS) for the IERS

As from 1 January 2001, the BIPM Time, Frequency and Gravimetry Section is responsible for the IERS Conventions in a joint effort with the US Naval Observatory (USNO). The CPC is co-chaired by Denis McCarthy of the USNO and Gérard Petit of the BIPM.


IGS WG on Time Products

In 1998 the International GNSS Service (IGS) and the BIPM established a joint Pilot Project to study accurate time and frequency comparisons using GPS phase and code measurements. The pilot project was disbanded at the end of 2002, when the IGS decided to transform it into a permanent activity.

A Working Group on Time Products was created in 2003. Dr Gérard Petit of the BIPM is a member, and the group is chaired by Dr Ken Senior (Naval Research Laboratory).